Pharmaceutical Carbon Neutral Wastewater Treatment System
Sinou is a manufacturer and supplier of high quality Pharmaceutical Carbon Neutral Wastewater Treatment System. The system treats complex, chemical-laden sewage while meeting strict pharmaceutical environmental standards and reducing carbon emissions. Sinou offers specialized treatment processes, certification support, and factory-direct pricing.
Our Pharmaceutical Carbon Neutral Wastewater Treatment System addresses the unique challenges, including residual drugs, high COD, and toxic substances. Sinou, as a professional manufacturer and supplier, combines advanced
neutralization, chemical treatment, and biological processes to meet strict pharmaceutical discharge standards while
supporting carbon reduction goals.
Specifications & Parameters
Model
Treatment Capacity (m³/h)
Treatment Mode
Total Power (kW)
Neutralization Effect (pH Value)
SS Content (mg/L)
SY-TZH50-1
50
Automatic / 4G Module
7.5
6–8
≤10
SY-TZH100-2
100
Automatic / 4G Module
11
6–8
≤10
SY-TZH150-2
150
Automatic / 4G Module
15
6–8
≤10
SY-TZH300-2
300
Automatic / 4G Module
30
6–8
≤10
SY-TZH400-5
400
Automatic / 4G Module
37
6–8
≤10
SY-TZH500-5
500
Automatic / 4G Module
45
6–8
≤10
Multi-stage Treatment Process Details
This system adopts three-stage graded purification process for complex
pharmaceutical sewage. Each unit works independently and cooperatively to remove various harmful substances
efficiently.
1. First-stage regulating tank: Complete preliminary pH adjustment and water quality homogenization,
balance the concentration of incoming sewage and reduce impact on subsequent treatment units.
2. Second-stage sedimentation unit: Remove large-particle impurities and macromolecular sediments in
sewage through gravity settling, realizing primary solid-liquid separation.
3. Third-stage fine purification unit: Use multi-layer filtration and targeted degradation
technology to remove residual pharmaceutical components and trace harmful substances thoroughly.
4. Adjustable reaction duration: Retention time of each stage can be adjusted flexibly according to
different pharmaceutical formulas and sewage concentration.
5. Exhaust gas collection structure: Equipped with supporting gas collection device to collect
volatile gas from pharmaceutical sewage and prevent air pollution.
6. Graded water quality monitoring: Install independent detectors in each stage to monitor treatment
effect in real time and find abnormal conditions early.
Packaging, Logistics & Full Delivery Process
We adopt professional anti-corrosion packaging and standardized logistics scheme
to ensure intact delivery, and complete a full set of procedures from production to final acceptance.
1. Professional anti-corrosion packaging: Wrap each component with moisture-proof and anti-collision
film. Precision sensors and pipelines are packed separately for focused protection.
2. Reinforced outer packing: Use solid wooden cases for the main unit, reinforce corners and bottom
to resist collision and extrusion during long-distance transportation.
3. Clear marking and labeling: Mark part numbers, installation directions and precautions on the
package for convenient on-site sorting and assembly.
4. Reasonable delivery cycle: Standard models are delivered within 15 working days; customized
pharmaceutical special models take 30 working days according to technical difficulty.
5. Safe transportation scheme: Select professional chemical equipment logistics providers, follow
transportation norms for industrial environmental devices.
6. On-site acceptance and handover: After goods arrive, engineers complete installation, wiring and
commissioning. Carry out continuous trial run and water quality test before formal handover and acceptance.
Core Product Advantages
Aiming at the complex characteristics of pharmaceutical sewage, this Pharmaceutical Carbon Neutral Wastewater Treatment System has
prominent advantages in corrosion resistance, treatment effect, safety and operational stability.
1. Strong overall corrosion resistance: The whole structure is strengthened with anti-corrosion
treatment to adapt to mixed acid, alkali and medicinal components in pharmaceutical sewage.
2. Targeted purification ability: The professional process aims at pharmaceutical residues, with
higher removal rate than ordinary wastewater equipment.
3. High operational safety: Fully sealed structure and exhaust gas collection system prevent leakage
of sewage and harmful gas, protecting on-site operators.
4. Stable long-term operation: Optimized pipeline and pump configuration reduce failure rate,
adapting to long-time continuous operation of pharmaceutical factories.
5. Flexible process adjustment: Process parameters can be modified according to different production
batches to cope with changing sewage composition.
6. Space-saving layout: Integrated modular design occupies small floor area, convenient for layout
in compact pharmaceutical factory workshops.
On Site Installation Diagram
Common Problems & Troubleshooting Methods
Master common faults and corresponding solutions to ensure continuous, safe and
compliant operation of pharmaceutical wastewater treatment system.
1. Insufficient pH adjustment effect: Check dosing pump flow and pipeline patency. Recalibrate pH
sensors and increase neutralizer dosage properly according to sewage concentration.
2. Slow water flow and pipeline blockage: Dismantle and clean blocked pipelines and filter elements.
Regularly remove attached medicinal sediments to keep smooth circulation.
3. Abnormal exhaust gas collection: Inspect air duct and fan operation. Repair damaged sealing parts
to prevent harmful gas overflow and ensure workshop air quality.
4. Unstable equipment running: Check power supply and circuit connection. Fasten loose mechanical
parts and eliminate abnormal jitter during operation.
5. Turbid final effluent: Extend sedimentation and filtration time. Check and replace aging filter
materials to improve interception effect of tiny impurities.
6. Control system failure: Restart the control program and check signal lines of sensors. Contact
technical support in time if remote debugging cannot solve the problem.
For inquiries about filter press, concrete reclaimer, wastewater system or price list, please leave your email to us and we will be in touch within 24 hours.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies.Privacy Policy